SUPPORT

TRAINING DATES

NOVEMBER 2017
Thurs 9th

SPACES


DECEMBER 2017
Thurs 7th

SPACES


BOOKING INFORMATION

If you have purchased a new Kamco Clearflow power flushing pump (either direct from us, or from a merchant) you are entitled to ONE FREE TRAINING PLACE per pump purchased.

If you wish to bring a colleague with you, additional places are available at £50* per person (maximum two additional places per company).

If you do not yet own a Kamco pump, but are considering purchasing one, a fee of £50* is payable. However, we will refund this fee if you then purchase a Kamco pump either on the Training day or within the two weeks afterwards.

If you have purchased a second hand Kamco pump, training is available at £50* per person.

PLEASE NOTE: TRAINING PLACES ARE LIMITED, SO IT IS IMPORTANT THAT YOU BOOK IN ADVANCE BY CALLING 01727 875020, with your pump serial number where appropriate.

(*Fee excludes VAT and is payable by credit/debit card at the time of booking).

Power Flushing Training

    TrainingBoiler manufacturers now insist that heating systems are properly flushed when installing a new boiler to an old system, and may even make the warranty conditional on this. As a result, and because many old systems have circulation problems, a power flushing pump is now an essential part of an engineer's toolkit.

    TrainingEvery Kamco Clearflow power flushing pump comes with comprehensive instructions, but in addition, every pump customer is entitled to attend a free training session at our St. Albans works. We hold these most Thursdays.

    For qualified, knowledgeable heating engineers, they last approximately four and a half hours, and ensure that engineers can confidently power flush heating systems and obtain the best results. We have a fully equipped training room with a complete working heating system (with a Vaillant combi boiler) on which the correct procedures are demonstrated.

    We discuss the different types of heating system and how best to flush them. Types of system covered are vented, sealed, combi boiler, microbore, gravity hot water, single-pipe, single-feed cylinders and thermal store systems.

    We don't just tell you what to do - we also tell you what NOT to do, and discuss with you the circumstances in which heating systems may be considered to be beyond power flushing.

    You'll find the training very informative. We've been building and using power flushing pumps since 1992, and we're happy to pass the know-how and insight gained on to our customers.

    To book a place see the 'BOOKING INFORMATION' column on the left of this page.

    CLICK HERE TO DOWNLOAD THE FULL TRAINING INFORMATION SHEET


    Click here to read PHAM magazine's article on our training sessionNEW: JANUARY 2015

    PHAM Magazine recently attended one of our training sessions.

    Click the image to read about it.